In development

GREENASH 7

A plant-scale line with a full pollution-control set. It is designed first for the Philippine market.

150–300 kg/hPer incinerator
50 t/dayWith 12 incinerators
6 setsPollution-control sets
Elevation drawing of the GREENASH 7 incinerator

Scales by adding incinerators.

Each line combines incinerators with shared pollution-control sets, sized to the daily volume.

At a glance.

TypePlant-scale line
InstallationFixed, with pollution-control set
Capacity150–300 kg/h per incinerator, 50 t/day with 12
Accepted wasteMixed solid waste, wet food waste, plastics, sludge, tires, medical waste
CombustionThree chambers, upper chamber held at 1,250 °C
Ash1–3% of input, handled as general waste
StatusIn development. Full specification on request.
Full-scale GREENASH plant installed under a steel shelter
A full-scale line installed under a steel shelter.

What makes it different.

All kinds of waste

Food waste, plastics, sludge and tires burn together, unsorted.

Very low emissions

Dioxin of 0.15 ng/Sm³-TEQ, one-thirtieth of the Korean limit.

Low running cost

About 200 W of power, and no pre-treatment plant to run.

Fast start-up

Working temperature in 20–30 minutes, not two days.

Proven technology

Tested by SGS and KTL, with ten patents granted.

Local support

Local technicians, 24-hour response and spare parts in stock.

Get in touch

Let’s talk about your waste.

Tell us what you need to treat and where. We will recommend the right system and visit your site.

Office

3F Salcedo One Center, 170 Salcedo St.
Legaspi Village, Makati City, Philippines

Sales & business

info@gegt.com

Exclusive distributor

GREENASH in the Philippines, since 2021