Mobile

GREENASH 3

A truck-mounted unit that goes where the waste is. It treats local waste while moving between sites.

0.5–4 t/daySized per site
20–30 minCold start
1–3%Ash left
GREENASH 3 mobile incinerator in yellow
Drawing of GREENASH 3 mounted on a truck
GREENASH 3 mounted on a truck.

Built for hard-to-reach places.

Islands, farms and disaster areas, or outbreaks such as bird flu where waste must be destroyed on the spot.

At a glance.

TypeMobile
InstallationMounted on a truck
CapacitySized per site, 0.5–4 t/day (20 h)
Accepted wasteMixed solid waste, wet food waste, plastics, sludge, tires, medical waste
Not acceptedStone, glass, metal and concrete
CombustionThree chambers, upper chamber held at 1,250 °C
Dioxin0.15 ng/Sm³-TEQ measured, against a 5 ng limit
Ash1–3% of input, handled as general waste
Cold start20–30 minutes
Power use1–3 kW main system, about 200 W control
OperationOne operator per 8-hour shift
Lead time3–4 months from decision to operation
WarrantyOne year, with consumables in local stock
GREENASH 3 seen from the side
GREENASH 3 from the side.

What makes it different.

All kinds of waste

Food waste, plastics, sludge and tires burn together, unsorted.

Very low emissions

Dioxin of 0.15 ng/Sm³-TEQ, one-thirtieth of the Korean limit.

Low running cost

About 200 W of power, and no pre-treatment plant to run.

Fast start-up

Working temperature in 20–30 minutes, not two days.

Proven technology

Tested by SGS and KTL, with ten patents granted.

Local support

Local technicians, 24-hour response and spare parts in stock.

Get in touch

Let’s talk about your waste.

Tell us what you need to treat and where. We will recommend the right system and visit your site.

Office

3F Salcedo One Center, 170 Salcedo St.
Legaspi Village, Makati City, Philippines

Sales & business

info@gegt.com

Exclusive distributor

GREENASH in the Philippines, since 2021